Summary Information on draft Basin Plan proposal and water recovery achieved

Schedule 2 of the draft Basin Plan and Plain English Summary sets out the proposed reductions in surface water diversions under the draft Basin Plan and the extent to which water has been recovered for the environment(prior to the 2009 baseline and then through to September 2011).

This table details the proposed water reductions by catchment

This table details MDBA estimates of environmental water recovery in the Murray‐Darling Basin.