The River Murray System Annual Operating Plan 2012-13

MDBA reports

The River Murray System Annual Operating Plan 2012-13

The River Murray System Annual Operating Plan for the 2012-13 water year (1 June 2012 to 31 May 2013) provides context and describes how the River Murray System (the System) may be operated under a number of assumed scenarios in the coming year.

The scenarios have been prepared by the Murray-Darling Basin Authority (MDBA or the Authority) with input from the Australian Government and the States of New South Wales, Victoria and South Australia through MDBA’s Water Liaison Working Group.