The River Murray System Annual Operating Plan for the 2012-13

MDBA reports

The River Murray System Annual Operating Plan for the 2012-13

October 2012 update

The River Murray System Annual Operating Plan for the 2012-13 (Operating Plan) water year (1 June 2012 to 31 May 2013) was released in July 2012 and provided context and descriptions of how the River Murray System (the System) may have been operated under a number of assumed scenarios.

This document provides an update of the six scenarios that were presented in the Operations Plan and the scenarios below should be used in conjunction with the original Operating Plan. The scenarios have been prepared by the Murray–Darling Basin Authority with input from the Australian Government and the States of New South Wales, Victoria and South Australia through MDBA's Water Liaison Working Group.