River Murray system annual operating plan end October 2015 update

MDBA reports

River Murray system annual operating plan end October 2015 update

The River Murray system annual operating plan for the 2015–16 water year (1 June 2015 to 31 May 2016) was released in August 2015. The operating plan describes how the River Murray system may be operated under a number of scenarios.

This document provides an update of the scenarios at the end of October 2015, and should be used in conjunction with the original plan. The scenarios have been prepared by the Murray–Darling Basin Authority with input from the Australian Government and the states of New South Wales, Victoria and South Australia through MDBA's Water Liaison Working Group.