Skip to main content
Go to search page
Published: 08 July 2011   •   Media release

The Murray–Darling Basin Authority, in conjunction with Goulburn-Murray Water, has announced that the refilling of Lake Mulwala will begin on Friday 8 July 2011.

Inflows upstream of Yarrawonga Weir will be partially captured over the coming weeks to gradually raise the lake by about 15 cm per day. At this stage, it is anticipated the lake will reach 124.7 m AHD by early August, in readiness for the irrigation season.

The immediate raising of the lake level means that irrigation channels can also begin filling as early as mid-July.

Lowering of the lake was successful in controlling the invasive aquatic weed Egeria densa by exposing it to the air.

The lowering began on 27 April 2011, reaching a low point of 121.86 m AHD on 19 June 2011.

For more information contact the MDBA Media office at media@mdba.gov.au

Receive MDBA updates via http://twitter.com/MD_Basin_Auth

Get in touch with the MDBA media team

Media releases

Sign me up to receive media releases:

Journalists can contact the MDBA media team by calling 02 6279 0141 or emailing media@mdba.gov.au.

We are a small media team and do not monitor emails after hours (including weekends). For urgent issues please call 0407 054 234.

Follow us on social media

Follow @MD_Basin_Auth on Twitter
Find MDBAuth on Facebook