Skip to main content
Go to search page

Latest

02 December 2011 Media centre

Summer pulse of environmental water to benefit fish

"The extra water will create a small pulse to benefit the nationally endangered trout cod and threatened Murray cod and silver perch, as well as...

02 December 2011 Media centre

Lowering of Mildura Weir pool next winter

The full drawdown of Mildura Weir pool (to about 3.6 m below full supply level, depending on river flows) is currently planned to commence in mid-May...

28 November 2011 Media centre

Draft plan now available and 20 weeks of consultation begins

The Murray–Darling Basin Authority today made available the draft Basin Plan for public comment. The Authority Chair, Craig Knowles said the draft...

10 November 2011 Media centre

Environmental watering to benefit The Living Murray's icon sites

The Murray–Darling Basin Authority today announced the release of up to 110 GL (billion litres) of The Living Murray's environmental water over the...

09 November 2011 Media centre

Launch of the MDBA blog ‘Free Flow’

Today we've launched the MDBA's blog 'Free Flow'. This is a place for open online conversations with the MDBA, where anyone can ask questions and...

04 November 2011 Media centre

Menindee Lakes release to increase soon

With summer approaching, the Murray–Darling Basin Authority advises that transfers of water from Menindee Lakes to the River Murray can be expected...

04 November 2011 Media centre

Murray-Darling Basin ministers met today in Canberra

Murray–Darling Basin ministers met today in Canberra and were briefed on key aspects of the draft Basin Plan. Read more

04 November 2011 Media centre

Statement from the Chair: 'On track for 28 November'

Following the outcomes from today's Ministerial Forum the MDBA is now clear to commence the 20-week formal consultation period on the draft Basin...

Pages