Skip to main content
Go to search page

Baseline Diversion Limit reports

The Basin Plan, under schedule 3, provides an estimate, in GL’s, of the baseline diversion limit (BDL) for all forms of take listed in the schedule for an SDL Resource Unit. These reports provide the methods used by the MDBA in determining the BDLs estimate shown in the Basin Plan in 2012. These are estimates only, and a better estimate may be provided by a state in the development of the water resource plans. The better estimate must be based on the description that is provided in schedule 3.

 

Downloads

Comparison of watercourse diversion esimates

Supporting information for the preparation of the proposed Basin Plan (November 2011).

Watercourse resource assessments for without-development and baseline conditions

Supporting information for the preparation of the proposed Basin Plan (November 2011).

Surface and/or groundwater inception activities

Initial estimates (Report by Sinclair Kinight Merz, CSIRO, Bureau of Rural Sciences, published June 2010).

Murray–Darling Basin sustainable yields project

Projects of effect of future farm dam development to the year 2020 on runoff. (Report by Sinclair Knight Merz, published 20 December 2007).

Published: 01 Jan 2014  •   MDBA reports