New South Wales formally submitted the proposed Gwydir Water Resource Plan (proposed WRP) package for assessment to the Murray–Darling Basin Authority (the MDBA) under the Water Act 2007 (Cth).

At the time of publication, a recommendation on accreditation has not yet been made by the MDBA to the Commonwealth Minister responsible for water. The proposed WRP is not operational. The publication of the proposed WRP on the MDBA’s website is to enable transparency.

*Note: The map of the WRP area referred to in this WRP can be found on the MDBA’s maps and spatial data web page.

Downloads

New South Wales proposed Gwydir Surface Water Resource Plan Factsheet
,
Key documents
New South Wales proposed Gwydir Surface Water Resource Plan
Schedule A: New South Wales Water Sharing Plan for the Gwydir Regulated River Water Source Order 2020
Schedule A: New South Wales Water Sharing Plan for the Gwydir Unregulated River Water Sources 2012
Schedule B: New South Wales Gwydir Water Resource Plan index — appears in WRP on page 94
Schedule C: New South Wales Gwydir Surface Water Resource Plan consultation report
Schedule D: New South Wales Risk assessment for the Gwydir surface water resource plan area (SW15)
Schedule E: Planning for environmental water — appears in WRP on page 100
Schedule F: Water for consumptive use information — appears in WRP on page 122
Schedule G: New South Wales Gwydir Surface Water Resource Plan Incident response guide
Schedule H: New South Wales water quality management plan for the Gwydir Water Resource Plan Area SW15
Schedule I: Information and tools used in preparing WRP — appears in WRP on page 136
Schedule J: New South Wales Gwydir surface water monitoring, evaluation and reporting plan
Appendix A: New South Wales Gwydir surface water Resource plan area description
Appendix B: New South Wales Gwydir Long Term Water Plan Part A: Gwydir Catchment
Appendix B: New South Wales Gwydir Long Term Water Plan Part B: Gwydir planning units
Appendix C: New South Wales No net reduction in planned environmental water: SW15 Gwydir surface water resource plan area
Appendix C – Attachment A: New South Wales Extreme wet and very wet period triggers–Gwydir Valley
Appendix C – Attachment B: New South Wales Gingham Watercourse rule change – additional information
,
Consultation reports — Attachments to Schedule C

Note: First Nation Consultation Reports include Traditional Cultural Knowledge provided by the Traditional Owners of each Nation consulted for the purpose of development and accreditation of water resource plans and water planning in NSW only. They are published here as part of the package of material for each water resource plan as submitted by NSW to support transparency. For the use of this material for any purpose, please refer to the copyright statement on the inside cover of each First Nation Consultation Report.

Attachment A — Schedule C: Culturally appropriate First Nations consultation report with Gomeroi Nation
,
Attachments to Schedule F
Attachment A — Schedule F: Gwydir Surface WRP – Modelling – Baseline Diversion Limit Scenario Report (update)
Attachment B — Schedule F: Gwydir Surface WRP – Modelling – Annual Permitted Take Scenario Report (Update)
,
Relevant state legislation
Water Management (General) Regulation 2011
Water Management (General) Regulation 2018
Access Licence Dealing Principles Order 2004
Water Management Act 2000 No 92
Updated: 10 Jul 2020  •   MDBA reports