Namoi – Water resource plan

New South Wales formally submitted the proposed Namoi Water Resource Plan (proposed WRP) package for assessment to the Murray–Darling Basin Authority (the MDBA) under the Water Act 2007 (Cth).

At the time of publication, a recommendation on accreditation has not yet been made by the MDBA to the Commonwealth Minister responsible for water. The proposed WRP is not operational. The publication of the proposed WRP on the MDBA’s website is to enable transparency.

*Note: The map of the WRP area referred to in this WRP can be found on the MDBA’s maps and spatial data web page.

Downloads

New South Wales Namoi proposed Water Resource Plan Factsheet
,
Key documents
New South Wales Proposed Namoi Surface Water Resource Plan
Schedule A: Water Sharing Plan for the Namoi and Peel Unregulated Rivers Water Sources 2012
Schedule A: Water Sharing Plan for the Peel Regulated River Water Source 2020
Schedule A: Water Sharing Plan for the Upper Namoi and Lower Namoi Regulated River Water Sources Order 2020
Schedule B: New South Wales Namoi Surface Water Resource Plan index — appears in WRP on page 97
Schedule C: New South Wales Namoi Surface Water Resource Plan Consultation Report
Schedule D: New South Wales Risk assessment for the Namoi Surface Water Resource Plan Area (SW14)
Schedule E: Planning for environmental water — appears in WRP on page 104
Schedule F: Water for consumptive use information — appears in WRP on page 127
Schedule G: New South Wales Namoi Surface Water Resource Plan Incident Response Guide
Schedule H: New South Wales Water quality management plan for the Namoi water resource plan area SW14
Schedule I: Information and tools used in preparing WRP — appears in WRP on page 142
Schedule J: New South Wales Namoi Surface Water Monitoring, Evaluation and Reporting plan
Appendix A: New South Wales Namoi Surface Water Resource Plan Area Description
Appendix B: New South Wales Namoi Long Term Water Plan Part A: Namoi catchment
Appendix B: New South Wales Namoi Long Term Water Plan Part B: Namoi planning units
Appendix C: New South Wales No Net Reduction in Planned Environmental Water — SW14 Namoi Surface Water Resource Plan Area
,
Consultation Report - Attachment to Schedule C

Note: First Nation Consultation Reports include Traditional Cultural Knowledge provided by the Traditional Owners of each Nation consulted for the purpose of development and accreditation of water resource plans and water planning in NSW only. They are published here as part of the package of material for each water resource plan as submitted by NSW to support transparency. For the use of this material for any purpose, please refer to the copyright statement on the inside cover of each First Nation Consultation Report.

Attachment A: Culturally Appropriate First Nations Consultation Report with Gomeroi Nation
,
Attachments to Schedule F
Attachment A: Namoi Surface WRP – Modelling – Baseline Diversion Limit Scenario for the Namoi Regulated River Water Source – October 2019 update
Attachment B: Namoi Surface WRP – Modelling – Peel Baseline Diversion Limit Scenario Report – Peel Regulated River System
Attachment C: Namoi SW WRP – Modelling – Annual Permitted Take Scenario Report (update)
,
Relevant state legislation
Water Management (General) Regulation 2011
Water Management (General) Regulation 2018
Access Licence Dealing Principles Order 2004
Water Management Act 2000 No 92
Updated: 22 Sep 2020  •   MDBA reports