Skip to main content
Go to search page

NSW Murray–Darling Basin Porous Rock – Water resource plan

New South Wales formally submitted the proposed NSW Murray–Darling Basin Porous Rock Water Resource Plan (proposed WRP) package for assessment to the Murray–Darling Basin Authority (the MDBA) under the Water Act 2007 (Cth).

At the time of publication, a recommendation on accreditation has not yet been made by the MDBA to the Commonwealth Minister responsible for water. The proposed WRP is not operational. The publication of the proposed WRP on the MDBA’s website is to enable transparency.

*Note: The map of the WRP area referred to in this WRP can be found on the MDBA’s maps and spatial data web page.

Downloads

New South Wales Murray–Darling Basin Porous Rock factsheet on proposed Water Resource Plan
,
Key documents
New South Wales Murray–Darling Basin Porous Rock proposed Water Resource Plan 2019
Schedule A: New South Wales Water Sharing Plan for the NSW Murray–Darling Basin Porous Rock groundwater sources 2020
Schedule B: New South Wales Murray–Darling Basin Porous Rock Water Resource Plan index — appears in WRP on page 75
Schedule C: New South Wales Murray–Darling Basin Porous Rock water resource plan consultation report
Schedule D: New South Wales Murray–Darling Basin Porous Rock risk assessment
Schedule E: New South Wales Murray–Darling Basin Porous Rock Water Resource Plan Incident Response Guide
Schedule F: New South Wales Murray–Darling Basin Porous Rock Water Resource Plan Water quality management plan
Schedule G: Information and methods used in preparing WRP — appears in WRP on page 85
Schedule H: New South Wales groundwater environmental monitoring, evaluation and reporting plan
Schedule I: Information relating to take for consumptive use — appears in WRP on page 89
Appendix A: New South Wales Murray–Darling Basin Porous Rock Water Resource Plan groundwater resource description
,
Consultation reports — Attachments to Schedule C

Note: First Nation Consultation Reports include Traditional Cultural Knowledge provided by the Traditional Owners of each Nation consulted for the purpose of development and accreditation of water resource plans and water planning in NSW only. They are published here as part of the package of material for each water resource plan as submitted by NSW to support transparency. For the use of this material for any purpose, please refer to the copyright statement on the inside cover of each First Nation Consultation Report.

Please note, the list of attachments to Schedule C containing separate Aboriginal Nation consultation reports are marked alphabetically. However, certain letters listing attachments are not included in the list for the following reasons:

Attachment I. This document (consultation report for the Nyeri Nyeri Nation) was not prepared as Nation indicated they did not identify with the WRP area after consultation.

Attachment J. This document (consultation report for the Tati Tati Nation) has not yet been provided. NSW has advised it is pending.

Attachment M. This document (consultation report for the Weki Weki Nation) has not yet been provided. NSW has advised it is pending.

Attachment A — Culturally appropriate First Nations consultation report with Barapa Barapa Nation
Attachment B — Culturally appropriate First Nations consultation report with Barkandji Maljangapa Nation
Attachment C — Culturally appropriate First Nations consultation report with Gomeroi Nation
Attachment D — Culturally appropriate First Nations consultation report with Maraura Nation
Attachment E — Culturally appropriate First Nations consultation report with Muthi Muthi
Attachment F — Culturally appropriate First Nations consultation with Nari Nari Nation
Attachment G — Culturally appropriate First Nations consultation report with Ngarabal Nation
Attachment H — Culturally appropriate First Nations consultation with Ngiyampaa Nation consultation report
Attachment K — Culturally appropriate First Nations consultation report with Wadi Wadi Nation
Attachment L — Culturally appropriate First Nations consultation report with Wemba Wemba Nation
Attachment N — Culturally appropriate First Nations consultation with Wiradjuri Nation — Volume 1 of 3: Lachlan River Valley
Attachment N — Culturally appropriate First Nations consultation with Wiradjuri Nation — Volume 2 of 3: Macquarie River Valley
Attachment N — Culturally appropriate First Nations consultation — Wiradjuri Nation — Volume 3 of 3: Murrumbidgee River Valley (and Murray River) (part 1)
Attachment N — Culturally appropriate First Nations consultation — Wiradjuri Nation — Volume 3 of 3: Murrumbidgee River Valley (and Murray River) (part 2)
Attachment O — Culturally appropriate First Nations consultation report with Yorta Yorta
,
Relevant state legislation
Water Management (General) Regulation 2011
Water Management (General) Regulation 2018
Access Licence Dealing Principles Order 2004
Water Management Act 2000 No 92
Updated: 06 Jul 2020  •   MDBA reports