The River Murray System Annual Operating Plan 2012-13

MDBA reports

The River Murray System Annual Operating Plan 2012-13

The River Murray System Annual Operating Plan for the 2012-13 water year (1 June 2012 to 31 May 2013) provides context and describes how the River Murray System (the System) may be operated under a number of assumed scenarios in the coming year.

The scenarios have been prepared by the Murray-Darling Basin Authority (MDBA or the Authority) with input from the Australian Government and the States of New South Wales, Victoria and South Australia through MDBA’s Water Liaison Working Group.

Download
The River Murray System Annual Operating Plan 2012-13

Tagged as: River Murray system

Publishing date: 25 July 2012