River Murray System Annual Operating Plan for 2013-14

MDBA reports

River Murray System Annual Operating Plan for 2013-14

The River Murray System Annual Operating Plan for the 2013-14 water year (1 June 2013 to 31 May 2014) provides context and describes how the River Murray System may be operated under a number of assumed scenarios in the coming year.

The scenarios have been prepared by the Murray–Darling Basin Authority (MDBA or the Authority) with input from the Australian Government and the States of New South Wales, Victoria and South Australia through MDBA's Water Liaison Working Group.

Download
River Murray System Annual Operating Plan for 2013-14

Tagged as: River Murray system

Publishing date: 06 August 2013