River Murray System Annual Operating Plan (Public Summary) 2010-11

MDBA reports

River Murray System Annual Operating Plan (Public Summary) 2010-11

The River Murray System Annual Operating Plan (Public Summary) for the 2010-11 water year (1 June 2010 to 31 May 2011) provides context and describes how the River Murray System (the System) may be operated under a number of assumed scenarios in the coming year.

The plan has been prepared by the Murray–Darling Basin Authority ('the MDBA' or 'the Authority') with input from the Australian Government, and the States of New South Wales, Victoria and South Australia through the MDBA's Water Liaison Working Group.

Download
River Murray System Annual Operating Plan (Public Summary) 2010-11

Tagged as: River Murray system

Publishing date: 19 October 2010